preloader

Kemlee Lake Lithium Project

Arbor Metals Corp. > Kemlee Lake Lithium Project

Project Details

The Kemlee lake Lithium Project (KLLP) is located in the heart of the Georgia Lake Lithium Camp, Thunder Bay Mining Division Ontario. The KLLP covers an area of 1500km, 3km east of RockTech Lithium’s Aumacho claim blocks and 12km south of the Georgia Lake Project, which (as of July 2022) has an indicated mineral resource of ~10.6Mt LiO2 at a cutoff grade of 0.88%. In March of 2024, RockTech selected the Norampac Paper Mill site as the location for its Lithium refinery, the first in Ontario, and 110km northeast of Thunder Bay. Production is forecasted for 2027.

Arbor’s KLLP shares many of the same geological signatures as the Georgia lake deposit, including bedrock geology and the presence of massive intrusive dykes. The target at the KLLP will be spodumene-bearing pegmatites hosted in metasediments.

Office Address

885 W Georgia St Suite 2200, Vancouver, BC V6C 3G1

Email Address

investors@arbormetalscorp.com

Call Us

+1 (888) 204-5681

Employment

To apply for a career with Arbor Metals Corp. Please send a cover letter together with your C.V. to info@arbormetalscorp.com

Links