Vancouver, Canada – June 9th, 2025 – Arbor Metals Corp. (“Arbor” or the “Company”) (TSXV: ABR, FWB: 432) is pleased to announce the commencement of its Phase 2 exploration program at its wholly owned Kemlee Lake Lithium Project, located on the eastern shore of Lake Nipigon, Ontario. This program follows the successful completion of the Phase 1 ground magnetic survey, which provided critical data to guide the next stage of exploration.
The Phase 2 program involves a property-wide prospecting campaign, with a particular focus on examining a ten-kilometer north-south trending dyke for the presence of spodumene, a lithium-bearing mineral. The prospecting program is expected to last between 3-4 weeks and will include surface sampling, mapping, and geological assessments to better define potential drill targets for future exploration.
“We are excited to begin Phase 2 of the exploration program at the Kemlee Lake Lithium Project,” said Mark Ferguson, President and CEO of Arbor. “The results of the Phase 1 ground magnetic survey have provided us with invaluable data, and we are eager to advance the project by focusing on the spodumene-bearing dykes identified in the geophysical survey. Our team is committed to exploring this promising area and building on the foundation laid by the initial exploration work.”
Arbor is committed to conducting all of its exploration activities with a strong focus on environmental responsibility. The Company adheres to industry-leading environmental guidelines and strives to minimize its environmental footprint throughout the exploration process. Furthermore, Arbor continues to work collaboratively with local indigenous groups and other stakeholders to ensure that its activities are aligned with the needs and concerns of the communities in which it operates. The Company is dedicated to fostering positive relationships and ensuring that the Kemlee Lake project benefits all involved parties.
Dr. Peter Born, P.Geo., is the designated qualified person as defined by National Instrument 43-101 and is responsible for and has approved the technical information contained in this release.
About Arbor Metals Corp.
Arbor Metals Corp. is a mining exploration company focused on developing high-value, geographically significant mineral projects worldwide. Arbor is paving the way for advanced mineral exploration as it oversees world-class mining projects. The Company is confident that combining quality projects with proven strategies and a dedicated team will yield exceptional outcomes.
The Jarnet, Corvette Lake and St. Pierre lithium projects, located in the James Bay region of Quebec, comprises 83 map-designated claims, covering an area of approximately 5,606 hectares. The projects are contiguous to the Corvette-FCI property, where diamond drilling has confirmed significant lithium mineralization representing one of the highest-profile lithium exploration projects in the sector.
The Kemlee Lake Lithium project is strategically located three kilometers east of Rock Tech Lithium Inc.’s Aumacho claim blocks and twelve kilometers south of the Georgia Lake Project. The Project shares many geological similarities with the prolific Georgia Lake deposit, including bedrock geology and the presence of massive intrusive dykes. The primary target at the Project will be spodumene-bearing pegmatites hosted in metasediments.
For further information, contact Mark Ferguson, Chief Executive Officer, at info@arbormetalscorp.com, or 403.852.4869, or visit the Company’s website at www.arbormetalscorp.com.
On behalf of the Board,
Mark Ferguson, Chief Executive Officer
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
This news release may contain certain “Forward-Looking Statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities laws. When or if used in this news release, the words “anticipate”, “believe”, “estimate”, “expect”, “target, “plan”, “forecast”, “may”, “schedule” and similar words or expressions identify forward-looking statements or information. These forward-looking statements or information may relate to further exploration of the Jarnet Lithium Project and other factors or information. Such statements represent the Company’s current views with respect to future events and are necessarily based upon a number of assumptions and estimates that, while considered reasonable by the Company, are inherently subject to significant business, economic, competitive, political and social risks, contingencies and uncertainties. Many factors, both known and unknown, could cause results, performance, or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements. The Company does not intend, and does not assume any obligation, to update these forward-looking statements or information to reflect changes in assumptions or changes in circumstances or any other events affecting such statements and information other than as required by applicable laws, rules and regulations.